Hebei E-valves Petroleum Equipment Co., Ltd.

Pursue quality and ensure service.

Manufacturer from China
Verified Supplier
3 Years
Home / Products / Choke Kill Manifold /

Remote Control Well Testing Choke Manifold Drilling API SpEC 16C

Contact Now
Hebei E-valves Petroleum Equipment Co., Ltd.
Visit Website
City:cangzhou
Province/State:hebei
Country/Region:china
Contact Person:MrDylan
Contact Now

Remote Control Well Testing Choke Manifold Drilling API SpEC 16C

Ask Latest Price
Video Channel
Brand Name :Hebei Pantu
Model Number :YG140
Certification :API 16C
Place of Origin :China
MOQ :1 set
Price :USD 50000-100000 per set
Payment Terms :T/T
Supply Ability :5 sets per 3 months
Delivery Time :7 work days
Packaging Details :Iron Case
Name :Choke Manifold Drilling
Model :YG140
Bore size :4 1/16"
Pressure :20000psi
Application :Drilling
Standard :API SpEC 16C
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

4 1/16 Inch 20000psi Choke Manifold Drilling API SpEC 16C

Choke Manifold Drilling Working principle


When the pressure rises in well, fluid in the well can be released in the utilization of the choke valve opening/closing in choke manifold to control casing pressure, which can directly blow out through the gate valve as the casing pressure is quite high.

Choke Manifold Drilling Parameter

Type Working pressure Main bore dia By-pass dia. Remarks
(psi) On.) (In.)
YG140 20000 4 1/16" 3 1/16" 2 9/16" 2 1/16" 3 1/16" 2 1/16" 2 9/16" Different types of combinations can be provided according to requirements
YG105 15000 4 1/16" 3 1/16" 2 9/16" 2 1/16" 3 1/16" 2 9/16" 2 1/16"
YG70 10000 4 1/16" 3 1/16" 2 9/16" 2 1/16" 4 1/16" 3 1/16" 2 9/16" 2 1/16"
YG35 5000 4 1/16" 3 1/8" 2 9/16" 2 1/16" 4 1/16" 3 1/8" 2 9/16" 2 1/16"
YG21 3000 4 1/16" 3 1/8" 2 9/16" 2 1/16" 4 1/16" 3 1/8" 2 9/16" 2 1/16"

Configuration


The choke manifold consists of choke valves, gate valves, line pipes, fittings, pressure gauges, and other components.

Operating Instructions


(1) The working pressure of all components on the choke manifold shall be compatible with that of the BOP stack used.
(2) The choke manifold shall be installed at a place where the operator can reach it easily. The pressure test must be performed before installation and the seat test pressure shall be equal to the rated working pressure.
(3) The line pipe shall be level and straight as much as it could. In case of the turn of the line pipe, the 120-degree steel bent pipe shall be used. The bore of the line pipe shall be large enough.
(4) The pressure gauge must be installed.
(5) In winter, the choke manifold can work under a low-temperature conditions.

Inquiry Cart 0